New progress in construction control of prestressed concrete cable-stayed bridges
Author:
Affiliation:

Clc Number:

U448.35

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the construction of prestressed concrete cable-stayed bridges, the control of geometric line and structural internal force is very important, according to this, in recent years, China's new progress in this regard, the application of modern engineering control theory in the idea of adaptive control to form a control system, which is mainly in the structural parameter identification and cast-in-place main girder elevation of the bottom mold of the real-time correction of the key technology breakthroughs, and after several large-span prestressed concrete cable-stayed bridges in the practice of the success of the experience achieved!

    Reference
    Related
    Cited by
引用本文

Chen Dewei, Xu Jun, Zhou Zongze, Li Guozhi New progress in construction control of prestressed concrete cable-stayed bridges. Prestress Technology 2006,10(01):9-12. 10.59238/j. pt.2006.01.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: