Construction control of pressure dispersive anchor cable in pile slab wall reinforcement project
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU746.3;U416.14

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the construction technology and quality control method of pressure distributed anchor cable in high slope pile slab wall reinforcement project through the construction practice of Gejiu ~ Lengdun high grade highway pile slab wall reinforcement project.

    Reference
    Related
    Cited by
引用本文

Runing Huang, Futang Wei, Ruihui Zhong, Fuming Liu Construction control of pressure dispersive anchor cable in pile slab wall reinforcement project. Prestress Technology 2005,9(05):26-31. 10.59238/j. pt.2005.05.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: