(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)
TU753.3;U448.27
Xianhui Liu, Liufang Tan, Juze Li(Translation), Haining Li, Fangwei Huang Construction and load test of Nagisa Bridge - Hybrid construction of PC cable-stayed bridge and steel suspension bridge. Prestress Technology 2005,9(04):27-34. 10.59238/j. pt.2005.04.008
复制