+Advanced Search 中文版
Construction and load test of Nagisa Bridge - Hybrid construction of PC cable-stayed bridge and steel suspension bridge
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU753.3;U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Nagisa Bridge is the first hybrid PC cable-stayed bridge in the world with the combination of prestressed concrete cable-stayed bridge and reinforced box girder suspension bridge.

    Reference
    Related
    Cited by
引用本文

Xianhui Liu, Liufang Tan, Juze Li(Translation), Haining Li, Fangwei Huang Construction and load test of Nagisa Bridge - Hybrid construction of PC cable-stayed bridge and steel suspension bridge. Prestress Technology 2005,9(04):27-34. 10.59238/j. pt.2005.04.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: