(Beijing Municipal Engineering Design and Research Institute, Beijing 10045, China)
Clc Number:
U442.5
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Chaobai River Bridge is a three-tower single-cable prestressed concrete low tower cable-stayed bridge. This paper mainly introduces the design conception and key points of the bridge, discusses the selection of the construction scheme and key points of the bridge, and finally briefly introduces the technical status of the short tower cable-stayed bridge in our country.
Reference
Related
Cited by
引用本文
Debiao Xu, Bin Hui Chaobai River bridge design. Prestress Technology 2005,9(03):3-5. 10.59238/j. pt.2005.03.001