Discussion on the construction technology and improvement design of anchor cable in the accumulation body of diversion ditch of Xiaowan Power Station
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

TU756;P642.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    It can be said that Xiaowan Hydropower Station is unique in the construction of similar projects in terms of the complexity of engineering geology, the difficulty of slope protection and the arduous construction task. This paper mainly introduces and analyzes the construction of the 2# mountain beam rescue slope project and the special construction technology adopted in the construction for extremely complex geological conditions, focusing on the drilling construction technology and method of eccentric drilling with pipe drilling and double pipe relay drilling, and the author's construction in order to solve the problem of no wind running and no leakage of large cracks at different depths in the hole At the same time, the author puts forward some improvement suggestions on the imperfections still existing in the rescue engineering design, hoping to play a role in promoting the faster development of geotechnical anchoring engineering technology in our country.

    Reference
    Related
    Cited by
引用本文

Haimin Li, Ruihui Zhong, Cheng Liu Discussion on the construction technology and improvement design of anchor cable in the accumulation body of diversion ditch of Xiaowan Power Station. Prestress Technology 2005,9(02):30-34. 10.59238/j. pt.2005.02.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: