(Shanghai Foundation Engineering Company Special Foundation Design Institute 200002)
TU984.14;U448
Thirty-two trusses of precast box girder and 16 trusses of track plate were produced on both sides of Hedong River and west River.
Shizhong Qiu Bridge cantilever assembly construction Technology <2>. Prestress Technology 2005,9(01):8-17. 10.59238/j. pt.2005.01.003