Abstract:
This paper introduces the key technology of castin situ prestressed concrete continuous box girder viaduct, which is used for the first time in Ningxia region, including the determination of construction scheme, the popularization and application of WDJ multi-functional scaffold, the construction of high grade concrete, and the construction method of post-tensioned prestressed steel strand.