+Advanced Search 中文版
Bridge cantilever assembly construction Technology <1>
Author:
Affiliation:

(Shanghai Foundation Engineering Company Special Foundation Design Institute 200002)

Clc Number:

TU744.5;U448

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Tianjin Yonghe Bridge with a main span of 260 meters has been applied in foreign countries, such as the P-K bridge in the United States with a main span of 300 meters.

    Reference
    Related
    Cited by
引用本文

Shizhong Qiu Bridge cantilever assembly construction Technology <1>. Prestress Technology 2004,8(05):5-36. 10.59238/j. pt.2004.05.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: