+Advanced Search 中文版
Donghai Bridge 70m cross-hole precast lifting concrete box girder design
Author:
Affiliation:

(China Railway Bridge Survey and Design Institute, Wuhan 430050, Hubei, China)

Clc Number:

TU528;U445

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The upper structure of the non-navigable hole of Donghai Bridge adopts the equal span 70m prestressed concrete continuous box girder. This paper introduces the structural design, anti-corrosion measures, pier top joint, structural calculation analysis and prefabrication of 70m span prestressed concrete box girder with full hole prefabrication.

    Reference
    Related
    Cited by
引用本文

Aihua Yan, Changyu Shao, Qinger Deng, Jun Wei Donghai Bridge 70m cross-hole precast lifting concrete box girder design. Prestress Technology 2004,8(04):32-35. 10.59238/j. pt.2004.04.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: