+Advanced Search 中文版
Main span 348m+348m three-tower single-cable plane PC beam cable-stayed bridge
Author:
Affiliation:

(China Railway Bridge Survey and Design Institute, Wuhan 430050, Hubei, China)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Yiling Yangtze River Bridge in Yichang City adopts three-tower cable-stayed bridge, the overall arrangement is (128.08+348+348+120.35)m. The rationality and structural characteristics of the bridge are introduced.

    Reference
    Related
    Cited by
引用本文

Jin Yang, Changyu Shao, Shuyu Sun, Qinger Deng Main span 348m+348m three-tower single-cable plane PC beam cable-stayed bridge. Prestress Technology 2004,8(03):37-39. 10.59238/j. pt.2004.03.008

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: