+Advanced Search 中文版
Design and construction control of Chongqing Yangtze River Lijiatuo Bridge cable-stayed bridge
Author:
Affiliation:

(Shanghai Municipal Engineering Design and Research Institute)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Lijiatuo Bridge of Chongqing Yangtze River is a double-tower and double-cable-plane prestressed concrete cable-stayed bridge with a main span of 444m. The main beam is a double main beam section, and the construction is constructed by the cable-stayed combination of hanging orchis and symmetrical cantilever.

    Reference
    Related
    Cited by
引用本文

Haoji He, Jinghui Ge, Yuanpei Lin Design and construction control of Chongqing Yangtze River Lijiatuo Bridge cable-stayed bridge. Prestress Technology 2004,8(03):7-11. 10.59238/j. pt.2004.03.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: