+Advanced Search 中文版
Prestressing construction of the section from Navy Dock to Yanwu Road on Huandao Road, Xiamen
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

U656.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper mainly introduces the construction technology of vertical and vertical prestressing of the box girder of Xiamen Huandao Road (Navy Dock to Yanwu section), and takes a series of measures to strengthen the control of each construction link in each stage of concrete construction, and obtains good results.

    Reference
    Related
    Cited by
引用本文

Yiyong Tan, Jianrong Tang, Xiangrong Shi Prestressing construction of the section from Navy Dock to Yanwu Road on Huandao Road, Xiamen. Prestress Technology 2004,8(01):24-32. 10.59238/j. pt.2004.01.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: