+Advanced Search 中文版
Construction of Beijing Shijingshan concrete cable-stayed bridge
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction method, equipment and related technology of Shijingshan concrete cable-stayed bridge in Beijing Fifth Ring Road are briefly introduced.

    Reference
    Related
    Cited by
引用本文

Xiangtian Zhou, Yifeng Sun, Baocheng Xiang, Hongwen Xiao Construction of Beijing Shijingshan concrete cable-stayed bridge. Prestress Technology 2004,8(01):19-23. 10.59238/j. pt.2004.01.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: