+Advanced Search 中文版
Vietnam Nguyen Van Ling Avenue steel pipe arch bridge interchangeable tie rod construction
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Clc Number:

U448.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking the construction of tie rod of Nguyen Van Ling Avenue Arch Bridge in Ho Chi Minh City as an example, this paper introduces the concrete construction method of interchangeable tie rod and various points for attention in the project.

    Reference
    Related
    Cited by
引用本文

Changlin Liang, Fangwei Huang, Wu Yang, Xianhui Liu Vietnam Nguyen Van Ling Avenue steel pipe arch bridge interchangeable tie rod construction. Prestress Technology 2004,8(01):7-11. 10.59238/j. pt.2004.01.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: