(Liuzhou Overwem Engineering Co., LTD)
U416.1
Yongsheng Wei, Zhiyong He, Hengmin Wei Treatment measures for strengthening subgrade slope of Liunan Expressway K727+900 upbound line. Prestress Technology 2003,7(05):33-40. 10.59238/j. pt.2003.05.005
复制