Beam closing section construction technology (2)
Author:
Affiliation:

(Shanghai Foundation Engineering Company)

Clc Number:

U443.31

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    3) The bridge floor is towed with 5 tons of slow winch as power,6/8 "steel wire rope and outlet (2 six-door hoists to wear the steel wire rope) as traction, 7.5cm seamless steel pipe as pipe, and slowly move to the required position on the road (16×22×250cm). 2, lifting beam in place 1)2 pieces of 40 meters long (?) The structural type and assembly of the load-bearing beam of the A-chord universal member are shown in Figure 7.

    Reference
    Related
    Cited by
引用本文

Shizhong Qiu Beam closing section construction technology (2). Prestress Technology 2003,7(03):8-12. 10.59238/j. pt.2003.03.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: