Construction of Deep Foundation Engineering for Beijing Capital Building
Author:
Affiliation:

Clc Number:

TU753.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Beijing capital building designed by Japan Shimizu construction, 50 floors above ground, 4 floors below ground, -23.76m. Beijing machinery construction company used 3 layers of anchors, internal and external ramps, excavators directly into the trench construction method, than the original program to save 4 million yuan, in the slope piles, anchors, girders, earthwork construction has many unique features, for China's deep foundation construction to provide valuable experience.

    Reference
    Related
    Cited by
引用本文

Han Xueguang Construction of Deep Foundation Engineering for Beijing Capital Building. Prestress Technology 2002,6(06):17-20. 10.59238/j. pt.2002.06.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: