    Abstract:

    This paper summarizes the application of hydraulic lifting equipment in the construction of thermal power generation and further improves the construction process of hydraulic lifting scheme by introducing the construction of section inversion of boiler assembly of Shanghai Waigaoqiao Power Plant Phase II 2×900MW Expansion Project.

    Reference
    Related
    Cited by
引用本文

Qin Cube, Tian Linsen, Yang Ke, Gan Qiuping, Li Xingkui Construction Technology for Inverted Installation of Extra Large Boiler Components in Shanghai Waigaoqiao Power Plant Phase II Project. Prestress Technology 2002,6(06):9-12. 10.59238/j. pt.2002.06.002

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: