+Advanced Search 中文版
Discussion on Partial Cable-Stayed Bridges
Author:
Affiliation:

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combined with the design and construction of Zhangzhou War Preparation Bridge, it analyzes the force principle, bridge characteristics and design points of partially cable-stayed bridges.

    Reference
    Related
    Cited by
引用本文

Chen Hengjin, Wang Kai, Li Chenggen Discussion on Partial Cable-Stayed Bridges. Prestress Technology 2002,6(03):23-26. 10.59238/j. pt.2002.03.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: