Abstract:The main bridge of Zhangzhou War Preparation Bridge is a single cable-stayed three-span prestressed concrete partial cable-stayed bridge, and the force of the cable-stayed structure of the bridge is fundamentally different from that of ordinary cable-stayed cables. This paper introduces the construction supervision process and control points of the extracorporeal prestressed cable-stayed cable-stayed bridge.