+Advanced Search 中文版
Protection of Stay Cable System
Author:
Affiliation:

(1.China Railway Bridge Bureau Group Second Company;2. Zhangzhou Highway Bureau;)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Zhangzhou war bridge tower using saddle type cable system, for the first time in China, this paper introduces the cable system of protective measures and construction methods.

    Reference
    Related
    Cited by
引用本文

Lei Tingxin, Zheng Qide, Zhou Zugan Protection of Stay Cable System. Prestress Technology 2002,6(03):18-19. 10.59238/j. pt.2002.03.005

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: