(1.China Railway Bridge Bureau Group Second Company;2. Zhangzhou Highway Bureau;)
Clc Number:
U448.27
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Zhangzhou war bridge tower using saddle type cable system, for the first time in China, this paper introduces the cable system of protective measures and construction methods.
Reference
Related
Cited by
引用本文
Lei Tingxin, Zheng Qide, Zhou Zugan Protection of Stay Cable System. Prestress Technology 2002,6(03):18-19. 10.59238/j. pt.2002.03.005