+Advanced Search 中文版
Installation of Stay Cables for Zhangzhou War Preparedness Bridge
Author:
Affiliation:

(1.Zhangzhou Highway Bureau;2. Liuzhou OVM Engineering Co., Ltd;)

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The cable-stayed cable of Zhangzhou War Preparation Bridge adopts OVM200 parallel strand tensioning system. This paper describes the installation of the cable-stayed cables and the equivalent tensioning process of the cable-stayed cables, providing empirical data for the construction and evaluation of some cable-stayed bridges.

    Reference
    Related
    Cited by
引用本文

Zheng Qide, Wei Futang, Cai Wensheng Installation of Stay Cables for Zhangzhou War Preparedness Bridge. Prestress Technology 2002,6(03):14-17. 10.59238/j. pt.2002.03.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: