Design of Stay Cables for the Main Bridge of Zhangzhou War Preparedness Bridge
Author:
Affiliation:

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Zhangzhou War Preparation Bridge is a (80.8+132.0+80.8)m double-tower single cable-stayed three-span continuous partially cable-stayed prestressed concrete box girder bridge, which introduces the arrangement of the cable-stayed cables of the main bridge, the system structure and the force.

    Reference
    Related
    Cited by
引用本文

Wang Kai, Zheng Hongyang, Li Min Design of Stay Cables for the Main Bridge of Zhangzhou War Preparedness Bridge. Prestress Technology 2002,6(03):6-8. 10.59238/j. pt.2002.03.002