The main bridge of Zhangzhou War Preparation Bridge is a (80.8+132.0+80.8)m double-tower single cable-stayed three-span continuous partially cable-stayed prestressed concrete box girder bridge, which introduces the arrangement of the cable-stayed cables of the main bridge, the system structure and the force.