Abstract:The main bridge of Zhangzhou War Preparation Bridge is a partially cable-stayed bridge with a main span of 132.0m, and the approach bridge is a continuous girder with a span of 32.0m. This paper introduces the overall design of the bridge, including the main bridge program selection, main and approach bridge design, landscape design and so on.