Design of Zhangzhou War Preparedness Bridge
Author:
Affiliation:

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Zhangzhou War Preparation Bridge is a partially cable-stayed bridge with a main span of 132.0m, and the approach bridge is a continuous girder with a span of 32.0m. This paper introduces the overall design of the bridge, including the main bridge program selection, main and approach bridge design, landscape design and so on.

    Reference
    Related
    Cited by
引用本文

Tang Shaoqing, Cai Wensheng, Chen Hengjin Design of Zhangzhou War Preparedness Bridge. Prestress Technology 2002,6(03):2-5. 10.59238/j. pt.2002.03.001