+Advanced Search 中文版
Hydraulic drag method for construction of steel-concrete composite continuous beam of Qinhuangdao–Shenyang passenger railway Bridge over Jinda Highway
Author:
Affiliation:

Clc Number:

U448.14

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Introduces the construction process of assembling and welding the steel girder portion of the Trans-Jinda Highway Bridge, and the main points of towing and pulling construction of steel girders.

    Reference
    Related
    Cited by
引用本文

Ran Rong, Zheng Chun Hydraulic drag method for construction of steel-concrete composite continuous beam of Qinhuangdao–Shenyang passenger railway Bridge over Jinda Highway. Prestress Technology 2002,6(02):25-28. 10.59238/j. pt.2002.02.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: