+Advanced Search 中文版
24 meters × Construction and testing of 24 meter prestressed well shaped beams
Author:
Affiliation:

(1.Zhenjiang Construction Project Quality Supervision Station;2. Jiangsu Xinzhu Prestressed Engineering Co., Ltd;)

Clc Number:

TU757.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This project is a pre-stressed tic-tac-toe building cover with a span-to-height ratio of up to 48. This paper describes the construction process and the characteristics of this project, and also gives the relevant test results.

    Reference
    Related
    Cited by
引用本文

Wang Donglin, Ma Kaimao, Fan Xiangdong 24 meters × Construction and testing of 24 meter prestressed well shaped beams. Prestress Technology 2002,6(01):32-34. 10.59238/j. pt.2002.01.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: