On curve 2 × Innovation in the Construction Design of 100m Reinforced Concrete Box Arch Buckle Cable Hoisting
Author:
Affiliation:

Clc Number:

U448.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Introduces two holes on the curve of the arch axis plane is a folding line staggered arrangement of reinforced concrete box arch buckle cable lifting construction program design of several innovations: double sets of cable crane - double stretcher beam lifting the arch ribs in place of the installation system, with a combination of pre-stressing buckling anchor cable system to replace the traditional winch - pulley group buckling, anchor cable system.

    Reference
    Related
    Cited by
引用本文

Zhong Qibin On curve 2 × Innovation in the Construction Design of 100m Reinforced Concrete Box Arch Buckle Cable Hoisting. Prestress Technology 2002,6(01):16-20. 10.59238/j. pt.2002.01.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 10,2023
  • Published: