+Advanced Search 中文版
Construction of prestressed concrete cast-in-situ continuous span box girder of Tanzhong Viaduct in Liuzhou
Author:
Affiliation:

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper summarizes the pre-stressing construction process of Tanzhong viaduct, focusing on the construction process and the application of new pre-stressing tensioning equipment in the construction.

    Reference
    Related
    Cited by
引用本文

Feng Mingyuan, Deng Yu, Lin Yichen Construction of prestressed concrete cast-in-situ continuous span box girder of Tanzhong Viaduct in Liuzhou. Prestress Technology 2001,5(06X):16-18. 10.59238/j. pt.2001.06X.005