Prestressed construction of Railway track beam of Shanghai maglev
Author:
Affiliation:

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the prestressing construction process of track girders for Shanghai Maglev Railway. The pre-stressing construction of track girders is divided into pre-tensioning and post-tensioning methods, and the post-tensioning method adopts HVM anchorage, which is tensioned in two times, in order to minimize the effect of concrete shrinkage and creep on the track girders. At the same time, the problem of placing the limit plate which should be paid attention to in the construction of this project is introduced.

    Reference
    Related
    Cited by
引用本文

Yang Wu, Zhu Wanxu Prestressed construction of Railway track beam of Shanghai maglev. Prestress Technology 2001,5(06X):14-15. 10.59238/j. pt.2001.06X.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 12,2023
  • Published: