+Advanced Search 中文版
Fracture mechanism analysis of vertical prestressed reinforcement of Zhangjiagang Bridge on Suzhou Jiaxing Hangzhou Expressway
Author:
Affiliation:

(1.Suzhou Sujiahang Expressway Construction Headquarters;2. CCCC Second Highway Survey, Design and Research Institute;)

Clc Number:

U412.366

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Zhangjiagang Bridge is a 40+70+40 (m) prestressed concrete continuous box girder structure with a three-way prestressing system, and when the vertical prestressing tendons of block 0 are tensioned, fracture occurs, and this paper analyzes the fracture mechanism through the assumption of the mechanical model, and proposes the construction control countermeasures

    Reference
    Related
    Cited by
引用本文

Shen Huirong, Wu Peisong Fracture mechanism analysis of vertical prestressed reinforcement of Zhangjiagang Bridge on Suzhou Jiaxing Hangzhou Expressway. Prestress Technology 2001,5(06):24-26. 10.59238/j. pt.2001.06.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: