+Advanced Search 中文版
Prestressed Construction of Toronto Telecommunications Tower
Author:
Affiliation:

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper briefly describes the problems encountered in prestressing the CN Tower in Toronto and how they were solved.

    Reference
    Related
    Cited by
引用本文

Zhou Hua Prestressed Construction of Toronto Telecommunications Tower. Prestress Technology 2001,5(05X):42-48. 10.59238/j. pt.2001.05X.010

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: