    Abstract:

    Zhangzhou Battle Bridge is the first short tower partially cable-stayed bridge in China. The upper part of the main tower is equipped with a circular arc-shaped saddle of internal and external steel pipes, and anti-slip anchorage is provided at the exit of the cable-stayed cables on both sides. The cable is symmetrically anchored to the girder through the inner steel pipe. The outer wrapped PE galvanized steel strand at the cable saddle is bare, and when the construction is completed, the inner pipe and anti-slip anchorage are filled with epoxy cement mortar. Tensioning construction adopts symmetrical synchronous tensioning at both ends.

    Reference
    Related
    Cited by
引用本文

Wei Futang, Sun Changjun Construction Technology for Manufacturing and Installing Stay Cables of Zhangzhou War Preparedness Bridge. Prestress Technology 2001,5(05):20-27. 10.59238/j. pt.2001.05.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: