+Advanced Search 中文版
Rotary Construction Technology for the Main Bridge of Zhuanshen Highway Overpass Bridge
Author:
Affiliation:

(The 11th Company of Transportation engineering Corporation of Jiangsu Province; Shanghai Songjiang Chengcheng Engineering Construction Supervision Co., Ltd)

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper discusses the construction technical problems such as rotary table grinding center, longitudinal girder arch rib construction system conversion and elevation adjustment of merging section in the construction of arch-beam combined transfer bridge.

    Reference
    Related
    Cited by
引用本文

Wang Jun, Feng Weijiang Rotary Construction Technology for the Main Bridge of Zhuanshen Highway Overpass Bridge. Prestress Technology 2001,5(02X):25-26. 10.59238/j. pt.2001.02X.007

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: