Abstract:It is that first time that the double circle surround unbonded prestressed concrete lin structure is used in the desilting tunnel of Xiaolangdi multipurpose dam project on the yellow river. this pap summarizes the characteristics of the structure, introduces the prestressed construction technology of concrete lining, and makes a statistical analysis of the prestressed tension data.