+Advanced Search 中文版
Stress analysis of tower cable anchorage zone of Ehuang Yangtze River Bridge
Author:
Affiliation:

Clc Number:

TU757

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Prestressed concrete pylon is used widely in cable-stayed bridge in our country. In this paper, the finite element method is used to analyze the stress of the anchorage zone of the hollow prestressed concrete tower of the Ehuang Yangtze River Bridge. The mechanical characteristics of the structure are pointed out, and some suggestions for the design of similar structures are put forward.

    Reference
    Related
    Cited by
引用本文

Zhu Yu, Wang Yijun, Wang Yongsheng, Yang Yaoquan, Nan Junqiang Stress analysis of tower cable anchorage zone of Ehuang Yangtze River Bridge. Prestress Technology 2001,5(01X):13-15. 10.59238/j. pt.2001.01X.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: