Abstract:In this paper, the temperature internal force calculated by the temperature field of each part of the bridge structure stipulated by the current bridge code in China is compared with the temperature internal force calculated by the temperature field of each part of the bridge structure stipulated by the British code "BS5400"(1982), and the influence of the temperature load on the internal force of the box girder is analyzed.