+Advanced Search 中文版
Construction Control of Main Bridge of Yajisha Bridge
Author:
Affiliation:

Clc Number:

U448.225.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Yabunsha Bridge adopts 76m+360m+76m three-span continuous self-anchored steel pipe concrete arch bridge to cross the Pearl River South Channel.

    Reference
    Related
    Cited by
引用本文

Xu Shengqiao, Ren Weidong, Li Yanming Construction Control of Main Bridge of Yajisha Bridge. Prestress Technology 2000,4(06):10-16. 10.59238/j. pt.2000.06.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: