Abstract:Introduction to the construction design of the vertical rotation of the steel pipe concrete arch of the Yuanyang River Bridge; hinge seat, hinge axis, buckling anchor cable, temporary tower and cable saddle, continuous traction power system, the hinge axis to the hinge seat of the alignment of the installation system; a brief description of the vertical rotation of the operating procedures; beam jacking method of installation of new technologies