    This paper briefly introduces the working principle of ZLD100 automatic continuous lifting system and its application process in the main span girder lifting project of Guijiang Third Bridge.

    Reference
    Related
    Cited by
引用本文

Wei Zhenliang, Xiang Baocheng, Xie Yonghong, Luo Huifen The Application of ZLD100 Automatic Continuous Lifting System in the Construction of the Main Span Cross Beam Lifting of the Hanging River Third Bridge. Prestress Technology 2000,4(04):24-27. 10.59238/j. pt.2000.04.006