Design and Construction of 50m Continuous Box Girders for the North Approach Bridge of Beihan Bridge of Nanjing Yangtze River Second Bridge
Author:
Affiliation:

Clc Number:

U448.215

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    It introduces the application of the advanced span-by-span casting construction method of mobile molding frame on the 5×50m continuous box girder bridge of the North Approach Bridge of Beicha Bridge of Nanjing Second Yangtze River Bridge. The method is highly automated and can effectively shorten the construction period. It also discusses the setting of pre-arch and the design problems related to the construction of this method.

    Reference
    Related
    Cited by
引用本文

Feng Yuncheng, Wei Guangsheng, Wang Sishun, Liu Shilin Design and Construction of 50m Continuous Box Girders for the North Approach Bridge of Beihan Bridge of Nanjing Yangtze River Second Bridge. Prestress Technology 2000,4(04):21-23. 10.59238/j. pt.2000.04.005

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: