+Advanced Search 中文版
Automatic Continuous Jacking Construction Technology for Steel Pipe Truss of Wanzhou Bridge
Author:
Affiliation:

Clc Number:

U448.145.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper mainly introduces the technical key of automatic continuous jacking construction of steel pipe truss on Wanzhou Bridge.

    Reference
    Related
    Cited by
引用本文

Wei Yongsheng, Tang Jianguo, Xie Yonghong, Kong Jianhua Automatic Continuous Jacking Construction Technology for Steel Pipe Truss of Wanzhou Bridge. Prestress Technology 2000,4(03):30-35. 10.59238/j. pt.2000.03.009

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: