+Advanced Search 中文版
Hydraulic Lifting Installation Construction of Steel Box Girders for Beijing East Fourth Ring Interchange
Author:
Affiliation:

Clc Number:

U445.469

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces a new lifting and installation method for steel box girders of large-span urban overpasses, and briefly describes its process and key construction technologies.

    Reference
    Related
    Cited by
引用本文

Tang Jianguo, Sun Yifeng, Peng Shengji Hydraulic Lifting Installation Construction of Steel Box Girders for Beijing East Fourth Ring Interchange. Prestress Technology 1999,3(04):10-12. 10.59238/j. pt.1999.04.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: