+Advanced Search 中文版
Application of Large Tonnage Pre Anchorage in the Dam Reinforcement Project of Shiquan Hydropower Station
Author:
Affiliation:

Clc Number:

TV698.23

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The large tonnage prestressing anchorage has been widely valued for its reasonable price, remarkable reinforcement effect and quick effect. After economic and technical comparison, Shiquan Hydropower Station chose prestressing anchorage solution to strengthen the dam body, through optimized design and careful construction, 30 bundles of 6-8MN grade anchors were successfully applied. Achieved significant economic and social benefits, and to expand the application and development of prestressed anchorage technology provides favorable conditions.

    Reference
    Related
    Cited by
引用本文

Wang Taiheng, Gao Zhongpu, Xia Kefeng Application of Large Tonnage Pre Anchorage in the Dam Reinforcement Project of Shiquan Hydropower Station. Prestress Technology 1999,3(03):38-39. 10.59238/j. pt.1999.03.011

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: