Top pushing construction method for cable-stayed bridges
Author:
Affiliation:

(1.Hunan Provincial Highway and Bridge Construction Corporation;2. Transportation planning Survey and Design Institute of Hunan Province;)

Clc Number:

U445.462

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge of Hunan Hengshan Xiangjiang Highway Bridge is designed as a cable-stayed bridge and continuous girder, which is constructed by two-way jacking method on both sides of the bridge. By setting up temporary piers, the navigable main span is transformed into a jacking span, and when the box girders are prefabricated and jacked in place, the towers, cables and cable ties are poured, the temporary piers are removed, and the conversion of the continuous girder to the cable-stayed bridge system is completed. Item push method construction cable-stayed bridge, the process is relatively simple, to expand the top push method in the application of large-span bridges carried out a useful exploration!

    Reference
    Related
    Cited by
引用本文

Chen Xianglin, Zhang Guiming Top pushing construction method for cable-stayed bridges. Prestress Technology 1999,3(01):34-37. 10.59238/j. pt.1999.01.009

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: