Abstract:In order to solve the problem of prefabrication of main girder blocks of Tianjin Yonghe Cable-stayed Bridge, it is proposed for the first time that the vertical prestressing tendons in the three-way prestressing blocks are made of non-bonded prestressing thick steel tendons, which mainly solves the problems of making holes for the weak section of the blocks and the problem of slurry cascading and simplifies the construction process.