Construction of prestressed anchor cables for foundation reinforcement of dam sections 1-5 # on the left bank of the Three Gorges powerhouse
Author:
Affiliation:

(Deputy Chief Engineer of 378 Joint Venture Company; Water and Electricity Third Bureau Basic Treatment Company)

Clc Number:

TV554

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The axial length of the 1-6# dam section of the Three Gorges left bank plant is 229.8m, and a high slope of nearly 70m was formed after the foundation excavation. Due to the combination of fractures, the sliding surface is unfavorable and tends to be downstream. Reinforcement treatment mainly adopts 3000KN grade prestressing anchor cable, total 218 bundles, length 30-55m, drilling hole diameter 165, total footage 8445.6m. Anchor cable construction and steel pipe trench excavation are carried out cross. After construction monitoring, the actual elongation of the anchor cable matches well with the theoretical value, and the loss of locking anchorage is 1%~3%, which meets the design requirements.

    Reference
    Related
    Cited by
引用本文

Ren Zongshe, Deng Debin Construction of prestressed anchor cables for foundation reinforcement of dam sections 1-5 # on the left bank of the Three Gorges powerhouse. Prestress Technology 1999,3(01):24-27. 10.59238/j. pt.1999.01.006

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 11,2023
  • Published: