+Advanced Search 中文版
In-situ test of annular post-tensioned prestressed concrete lining of diversion tunnel of Tianshengqiao power Station
Author:
Affiliation:

(Liuzhou Overwem construction machinery Co., LTD)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
引用本文

Xianhui Liu In-situ test of annular post-tensioned prestressed concrete lining of diversion tunnel of Tianshengqiao power Station. Prestress Technology 1998,2(06):12-13. 10.59238/j. pt.1998.06.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: