+Advanced Search 中文版
Construction of prestressed anchor cable of machine beam at dam top of Lingjintan Hydropower Station
Author:
Affiliation:

(China Water Resources and hydropower eighth engineering Bureau Lingjin Beach construction Bureau)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
引用本文

Jianxiang Tu Construction of prestressed anchor cable of machine beam at dam top of Lingjintan Hydropower Station. Prestress Technology 1998,2(03):17-20. 10.59238/j. pt.1998.03.003

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 09,2023
  • Published: