Design and Analysis of a Partially Cable-Stayed Bridge over the Mingyue Qujiang River in Guang'an
Yiyun Zhou , Liejun Yang , Kaisheng Feng , Shiwei Xiao
China Huaxi Engineering Design and Construction Co., Ltd, Chengdu 610031 , Sichuan, China
Abstract
The long bridge over the Mingyue Qujiang River in Guang'an, Sichuan, China is a prestressed concrete partially cable-stayed bridge with a main bridge span arrangement of (110+210+110) m constructed with a pier-girder-tower fixed system. The girder features a single-box three-chamber section, measuring a width of 23 m, a height of 7.5 m at the main pier top, and a height of 1.6 m at mid-span. The girder is reinforced with prestressed steel bars in three directions and constructed using the cast-in-place cantilever method. The main tower is a reinforced concrete structure with a rectangular cross-section and a height of 32.05 m. The bridge has a total of 56 pairs of stay cables in a single plane. Sleeve cable saddles are adopted with two-way anti-slip keys arranged on both sides of tower wall. The findings in this study serve as a reference for the design of similar projects in the future.
1 Introduction
Continuous girder bridges are highly cost-effective bridge structures offering several benefits, including excellent structural integrity, minimal presence of expansion joints, and a smooth driving experience. By fixing the pier and the girder, a continuous rigid frame bridge can be formed. The fixed connection between the pier and the girder creates a rigid framework, resulting in a more balanced distribution of internal forces within the structure. Additionally, this design eliminates the need for bearings and avoids the complexity of system conversion during construction. Therefore, this type of bridge is particularly suitable for spans ranging from 100 to 300 m. Nevertheless, in recent years, continuous rigid frame bridges with main spans exceeding150 m have faced significant challenges, primarily related to the development of cracks in prestressed concrete girders and excessive deflection at the midspan [1]. In response, engineers have adopted various improvement measures. For instance, they have utilized lightweight and high-strength concrete, as seen in the Stolma Bridge in Norway; alternatively, they have replaced a section of the girder at the mid-span with steel box girders, as demonstrated by the double-line Yangtze River bridge at Shibanpo in Chongqing, China. Such modifications aim to reduce the dead weight of girders and enhance the load-bearing capacity of the bridges [2]. Nevertheless, these improvement measures do not lead to a substantial improvement in the load-bearing performance of the bridges. As an alternative, transferring some of the prestressed force within the girder near the supports can be employed. In such cases, the continuous rigid frame bridge evolves into a partially cable-stayed bridge. Since the cable distance from neutral plane of the girder is significantly greater in a Partially cable-stayed bridge compared to conventional internal cables, this characteristic allows for a significant improvement in the load-bearing performance of the girder [3]. Using the partially cable-stayed bridge over the Mingyue Qujiang River in Guang'an, Sichuan, China as a case study, this study examines the design approach for partially cable-stayed bridges. The findings can be used as a reference for future projects of a similar nature.
2 Project Overview
Positioned approximately 250 m downstream from Mingyue Ferry in Mingyue Town, Huaying, the long bridge over the Mingyue Qujiang River stretches across the Qujiang River. Upstream from the bridge site, at a distance of 2.5 km, is the Huangmadu Qujiang Bridge. Downstream, at distances of 8.6 km and 28.1 km, respectively, are the Yujiazui Qujiang Bridge and the Fuliutan Junction. The river segment within a4-kilometer range upstream and downstream of the bridge area forms a pronounced "U"-shaped bend. The bridge is situated in the middle portion of the bend, where the main current of the river runs near the right bank, with the left bank being occupied by the Mingyue Reef Beach measuring approximately 5 m in length and nearly 150 m at its widest point. At the bridge location, the river segment exhibits an asymmetrical, narrow, and deep U-shaped river valley, where the river width is approximately 300 m. The Qujiang River experiences its flood season from May to October each year, while the dry season occurs from November to April of the following year. The flood season represents approximately 86.1% of the total annual runoff, whereas the dry season corresponds to around 13.9% of the annual runoff. The bridge location is designated as a Class III waterway in river segment planning.
The predominant geological formations in the project area include a Quaternary Holocene artificially filled soil layer (Q4me) , Quaternary Holocene residual slope deposit (Q4dl+el) , Quaternary Holocene alluvial deposit (Q4al+pl) silt, and clay with gravel in the alluvium of the Pleistocene in the fourth series (Q2al) . The underlying bedrock primarily consists of sandstone, sandy mudstone and mudstone interbedded with unequal thickness in the Upper Shaximiao Formation of the Middle Jurassic (J2s) .
The automobile load rating is classified as Highway Class I, while the peak acceleration of seismic motion measures 0.05g; the bridge's seismic fortification category is class A [4].
3 Structural Design
3.1 Bridge Span Arrangement
The main bridge is constructed as a prestressed concrete cable-stayed bridge with a span of (110+210+110) m, while the approach bridges on both sides are prestressed concrete continuous T-girder bridges with a span of 40 m each. The bridge consists of a combination of 5 spans measuring 40 m each, followed by a section measuring 430 m (110+210+110 m) , and then 4 more spans measuring 40 m each; the total length of the bridge is 799 m. The elevation layout of the bridge is shown in Figure 1.
The main bridge is constructed using a tower-girder-pier consolidation system, and at the junction piers (piers #5 and #8) , both vertical bearings and horizontal limit stops are arranged.
Figure1 Elevation View of the Mingyue Qujiang River Bridge in Guang'an (Unit: cm)
3.2 Girder Design
The girder is designed as a fully prestressed element featuring a variable-height single-box three-chamber section. The side webs are configured as inclined webs, and three-directional prestressed tendons are incorporated within the girder. C60 concrete is used for the construction. The girder features a bottom curve shaped like a second-order parabola, with a straight section length of 18.00 m for the middle span and 13.80 m for side spans. The top deck of the girder measures 23.0 m in width, and the cantilever length of the deck measures 4.00 m in length; the height of the girder at the mid-span is 3.20 m, and the girder height at the main pier top is 7.50 m. The top deck is 30 cm thick, whereas the bottom deck thickness increases from 28 cm at the mid-span to 70 cm at the top of the pier; the side webs have a thickness of 60 cm, and the middle web is 45 cm thick. The thickness of the cantilever board is 20 cm at the end, 37.5 cm in the middle, and 75 cm at the root. Transverse diaphragms are installed at the top of the pier and at the anchorages of the stay cables, with manholes incorporated on these partitions. The transverse diaphragm in the central chamber has a thickness of 50 cm, while the transverse diaphragm in the side chambers has a thickness of 30 cm. The thickness of the end beam is 180 cm. The bottom deck of the girder is horizontally level, whereas the top deck features a bidirectional slope of 2%. The zero block of the girder measures 12 m in length, and the standard segment lengths for cantilever construction are available in two options: 3.50 m and 4.00 m. The bridge has 3 closure segments, each measuring 2 m in length; the maximum weight allowed for the cantilever construction segments is 3201 kN. The general structural diagram of the girder is shown in Figure 2.
Figure2 General Structure of the Girder (Unit: cm)
Figure 3 shows the types of longitudinal prestressed tendons used in the box girder, which include five different specifications of high-strength and low-relaxation steel strands: 12 𝜙 𝑠 15.2, 15 𝜙 𝑠 15.2, 17 𝜙 𝑠 15.2, 19 𝜙 𝑠 15.2, and 22 𝜙 𝑠 15.2. These tendons are designated for different purposes within the structure. Specifically, "T" refers to the tendons for the top slab of segmental cantilever, "W" refers to the tendons for the bottom slab of segmental cantilever, "ST" refers to the tendons for the top slab of side spans closure, "SB" refers to the tendons for the bottom slab of side spans closure, "CT" refers to the tendons for the top slab of mid spans closure, "CB" refers to the tendons for the bottom slab of mid spans closure, "Z" refers to the tendons in the mid-web slab, and "B" refers to the tendons in the side-web slab.
Figure3 Layout Diagram of Longitudinal prestressed Tendons in the Girder (Unit: cm)
Table1Specifications for Girder Tendons
The girder adopts a three-dimensional prestressed system. Except for segment zero and the transverse prestressed tendons inside the end beam, which are 10 𝜙 𝑠 15.2 strands, the vertical and transverse prestressed tendons in the remaining segments are all 5 𝜙 𝑠 15.2 strands. The utilized tendons are high-strength low-relaxation steel strands with a flat anchorage system that exhibits low shrinkage. In the box girder, vertical prestressed tendons are arranged along the longitudinal web at approximately 50 cm intervals, alternating with the longitudinal web tendons within the web.
Figure4 Layout Diagram of Transverse and Longitudinal Prestressed Tendons in the Girder (Side Span) (Unit: cm)
3.3 Main Tower
The main tower is a reinforced concrete structure with a rectangular cross-section on the central median strip. The main tower has a width of 2.5 m in the transverse direction and a gradually increasing width in the longitudinal direction from 4.5 m in the cable section to 7.0 m at the base of the tower. The tower has a height of 32.05 m. The anchoring method for the stay cables at the top of the tower utilizes a sleeve saddle structure. The main tower is constructed using C50 concrete, as shown in Figure 5.
Figure5 General Structure of the Main Tower (Unit: cm)
3.4 Stay Cable and Saddle Design
The bridge is furnished with 56 pairs of single-plane dual-row cables on the central median strip. The non-cable segment length of the girder near the base of the main tower is 36.00 m; the cable spacing on the girder is 4.00 m, while the cable spacing at the top of the tower is 0.85 m. The stay cables are constructed using high-strength epoxy-coated steel tendons. The specifications for cables C1~C8 are 37 𝜙 𝑠 15.2, while the specifications for cables C9~C14 are 43 𝜙 𝑠 15.2. The nominal strength of the steel tendons, also known as 𝑓 𝑝 𝑡 𝑘 , is 1860 MPa. For design purposes, the strength is typically taken as 0.55 times the nominal strength, which in this case would be 1023 MPa.
The cable saddles adopt a sleeve structure, where each steel tendon passes through its corresponding guide tube, creating a separate arrangement that does not interfere with each other. Anti-slip anchor cages are installed at both ends of the saddle on the tower, and special formula high-strength epoxy grout is poured after anchoring to resist the unbalanced cable forces on both sides of the tower saddle.
Figure6 General Construction of Cables
Table2Cable Specifications and Design Cable Forces
4 Main Bridge Calculation
4.1 Material Properties
The physical property parameters of the main materials used in the structural analysis of the main bridge are shown in Table 3 [6].
Table3Physical Property Parameters of Each Material
4.2 Load Conditions
The main tower of the main bridge is a concrete structure, and the box girder is designed as a fully prestressed concrete component. The static analysis of the construction stage and the completion stage is carried out by using a single girder model.
4.2.1 Permanent Effects
Permanent effects include structural gravity, prestress, cable force, foundation displacement, concrete shrinkage and creep. The detailed parameters are as follows:
(1) The bulk density of the main structure concrete is proposed to be26.5 kN/m3, and the bulk density of the pavement concrete is 25 kN/m3 ;
(2) For the second phase, the dead loads such as bridge deck pavement and guardrails should be calculated based on their actual weight;
(3) The prestressed tendons and cable forces should be determined based on the design values;
(4) Uneven settlement: The main piers should be calculated with a settlement of 2 cm, while the junction piers should be calculated with a settlement of 1 cm;
(5) Concrete shrinkage and creep should be calculated based on the specifications [5].
4.2.2 Variable Effects
Variable effects include vehicle loads, crowd loads, temperature effects, etc. In the calculations, the construction loads during the construction (e.g. hanging baskets) and the structural internal forces, stresses, and displacements caused by the lane load during the service phase are taken into account. The parameter values for variable effects are as follows:
(1) Vehicle load class: Highway Class I; the vehicle loads are considered for a fourlane configuration in both directions, taking into account longitudinal reduction, transverse reduction, and the effect of eccentric loading; the transverse distribution factor for vehicle loads is taken as 3.484;
(2) The calculation of car braking forces follows the specifications outlined in the General Specifications for Design of Highway Bridges and Culverts (JTG D60-2015) [4], using a two-lane configuration in the same direction;
(3) The crowd load is determined based on the General Specifications for Design of Highway Bridges and Culverts (JTG D60-2015) [4], with a value of 2.5 kN/m2 .
(4) The design closing temperature range is set between 15 to 18°C, considering the following temperature effects: System warming by 25°C and system cooling by 25°C;
(5) The temperature gradient is determined based on the specifications outlined in the General Specifications for Design of Highway Bridges and Culverts [4], specifically Section 4.3.10. For the given case, T1 is taken as 14°C, and T2 is taken as 5.5°C;
(6) During the calculation, the dead weight of the hanging basket, including the formwork, is considered as 1600 kN; if there are any changes in the weight of the hanging basket, it is necessary to recalculate the internal forces and elevations depending on the actual conditions.
4.3 Static Calculation Results of Main Bridge
The calculation results for the girder during the construction are shown in the diagram below, where tensile stress is represented as positive values and compressive stress is represented as negative values. It can be seen that the maximum compressive stress during the girder construction is-20.5 MPa, located at the lower edge of the mid-span; the maximum tensile stress is 0.5 MPa, located at the anchor position of the C1 cable girder end; the stress calculation results comply with the Code [6].
Figure7 Minimum Stress on Top Edge of the Girder (Unit: MPa)
Figure8 Minimum Stress on Bottom Edge of the Girder (Unit: MPa)
Figure9 Maximum Stress on Top Edge of the Girder (Unit: MPa)
Figure10 Maximum Stress on Bottom Edge of the Girder (Unit: MPa)
The girder's load-bearing capacity includes its bending load-bearing capacity and shear load-bearing capacity. The envelope diagram below shows that both the bending moment and shear force of the girder are smaller than its load-bearing capacity, which meets the requirements of Code [6].
Figure11 Bending Torque Envelope of the Load-bearing Capacity of the Girder (Unit: N*m)
Figure12 Shear Envelope of the Load-bearing Capacity of the Girder (Unit: kN)
The check calculation results of crack resistance in the limit state of the normal use of girder are shown in the figure below, where tensile stress is represented as positive values and compressive stress is represented as negative values.
Figure13 Top-edge Stress Envelope Diagram of the Girder (Unit: MPa)
Figure14 Bottom-edge Stress Envelope Diagram of the Girder (Unit: MPa)
The check calculation results of stress in limit state of the normal use of girder are shown in the figure below, where tensile stress is represented as positive values and compressive stress is represented as negative values.
Figure15 Top-edge Stress Envelope Diagram of the Girder (Unit: MPa)
Figure16 Bottom-edge Stress Envelope Diagram of the Girder (Unit: MPa)
4.4 Calculation of Stay Cable Forces
The calculation results for cable stresses are presented in the following table:
Table4The results of cable stresses
The maximum stress in the stay cable is 983.4 MPa, which is below 0.55 times the standard strength of 1023 MPa. This satisfies the requirements specified in the Code [5], and the minimum safety factor is 1.89.
4.5 Stability Analysis
Taking into account the influence of construction and operational wind loads, the calculation results are as shown in the following table:
Table5Stability Factors for Various Conditions:
Elastic Eigenvalue Stability Analysis Table: During the construction of the main bridge, the minimum safety factor for stability is 32.8. During the bridge completion, the minimum safety factor for stability is 36.9. Both values are greater than 4, satisfying the requirements specified in the Code [6].
4.6 Seismic Analysis
A three-dimensional finite element model of the entire bridge was constructed to calculate internal forces and deformations under seismic loads. Taking into account the design code requirements and utilizing available geological data, seismic ground motion input was reasonably determined. Time history analysis was employed to calculate the effects under different seismic motions.
The calculation results indicate that under both E1 and E2 seismic actions, the bridge meets the requirements outlined in the "Seismic Design Code for Highway Bridges.
5 Conclusion
The Mingyue Qujiang Bridge features a prestressed concrete cable-stayed main span with a length of (110+210+110) meters. The girder section of the main pier top has a height of 7.5 m, while the mid-span section has a height of 3.2 m. Compared to continuous rigid-frame bridges with similar spans, this design significantly reduces the girder height, resulting in an improvement in main girder stress.
Compared to cable-stayed bridges with similar spans, this bridge requires fewer stay cables, and the cable stress amplitudes are low. Additionally, the safety factor requirements have been reduced from 2.5 to 1.5. This bridge design is highly competitive for main spans ranging from 200 m to 300 m.
The outcomes of this study can be used as a reference for the design of partially cable-stayed bridges with similar spans.
Figure1Elevation View of the Mingyue Qujiang River Bridge in Guang'an (Unit: cm)
Figure2General Structure of the Girder (Unit: cm)
Figure3Layout Diagram of Longitudinal prestressed Tendons in the Girder (Unit: cm)
Figure4Layout Diagram of Transverse and Longitudinal Prestressed Tendons in the Girder (Side Span) (Unit: cm)
Figure5General Structure of the Main Tower (Unit: cm)
Figure6General Construction of Cables
Figure7Minimum Stress on Top Edge of the Girder (Unit: MPa)
Figure8Minimum Stress on Bottom Edge of the Girder (Unit: MPa)
Figure9Maximum Stress on Top Edge of the Girder (Unit: MPa)
Figure10Maximum Stress on Bottom Edge of the Girder (Unit: MPa)
Figure11Bending Torque Envelope of the Load-bearing Capacity of the Girder (Unit: N*m)
Figure12Shear Envelope of the Load-bearing Capacity of the Girder (Unit: kN)
Figure13Top-edge Stress Envelope Diagram of the Girder (Unit: MPa)
Figure14Bottom-edge Stress Envelope Diagram of the Girder (Unit: MPa)
Figure15Top-edge Stress Envelope Diagram of the Girder (Unit: MPa)
Figure16Bottom-edge Stress Envelope Diagram of the Girder (Unit: MPa)
Table1Specifications for Girder Tendons
Table2Cable Specifications and Design Cable Forces
Table3Physical Property Parameters of Each Material
Table4The results of cable stresses
Table5Stability Factors for Various Conditions:
Liu, Y. Study on the Problem of Mid-Span Downward Deflection of Pre-stressed Continuous Rigid Concrete Bridges. Wuhan University of Technology, Wuhan,2010.
Shao, X. Bridge Engineering;China Communications Press: Beijing,2016.
Chen, J.;Chen, K.;Zhang, Y. Design of Extradosed Bridge of Nanpan River Bridge. Bridge Construction 2009,36-39,56.
Ministry of Transport of the People's Republic of China JTG/T D60—2015 General Specifications for Design of Highway Bridges and Culverts.2015.
Ministry of Transport of the People's Republic of China JTG/T 3365-01—2020 Specifications for Design of Highway Cable-stayed Bridge.2020.
Ministry of Transport of the People's Republic of China JTG 3362—2018 Specifications for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts. China Communications Press: Beijing,2018.