+Advanced Search 中文版
Anchorage Design of Xiamen Haicang Bridge
Author:
Affiliation:

(1. China Communications Highway Planning and Design Institute; 2. Liuzhou Hi-Sea Construction Machinery Co., Ltd.)

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The west channel bridge of Xiamen Haicang Bridge is the first three-span continuous steel box girder suspension bridge under construction in China. Its anchorage structure is novel, reasonably stressed, economical in materials and magnificent in shape. This paper mainly introduces the design conditions, structural characteristics and construction key points of its anchorage body and prestressed anchorage system.

    Reference
    Related
    Cited by
引用本文

Zhou Shanshui, Liu Minghu, Tang Xiaoping Anchorage Design of Xiamen Haicang Bridge. Prestress Technology 2002,6(S04):41-46. 10.59238/j. pt. HVM2002.04.004

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 04,2026
  • Published: